Logo Music.png
Zefiro Calibrator Icon Shop Electric.png
Statistics
Zefiro Calibrator.png
Type Common Electric (200%)
Power 75 Icon Power.png
Slots 1 Icon Uncommon Slots.png
Tax Free
Dispatch XP 601 XP.png
Set Calibrator Liner I (+30%)
Offer Information
Offer Type Offer Date Cost Buy XP Level Restrictions
Icon Shop SO.png Special 26 Jul 2016 320 Gems.png 117,105 XP.png 90 Limit 2
Icon Shop VO.png Vintage 16 Apr 2017 275 Gems.png 107,100 XP.png 70 Limit 3
Logo Limited.png Limited 1 Jul 2019-
15 Jul 2019
430 Gems.png 15,715,500 XP.png 720 Limit 10
1,571,536,000 Gold.png 750 Limit 1
Museum
Chinese Ministry of Railways (MOR) ordered eighty Zefiro 380 high-speed trains in September 2009, to be produced at Bombardier's joint venture Sifang (Qingdao) Transportation Ltd. The order of twenty 8-car sets and sixty 16-car sets was estimated to be worth 27.4 billion RM. They have been designated CRH380D (8-car set) and CRH380DL (16-car set). As of the most recent news, the order has been changed to include only seventy 8-car sets, designated as the CRH380D. Orders for the 16-car DL sets were converted to D sets in late 2011.The first two sets have been delivered on April 4th 2012 and started to undergo the first series testing.
Source: http://en.wikipedia.org/wiki/Bombardier_Zefiro
Community content is available under CC-BY-SA unless otherwise noted.