Contractor Profile | ||
---|---|---|
Template:ProfileLucy | ||
Total Contracts | 90 | |
Difficulty | Hard | |
Minimum Level | 85 | |
Final Reward | Rain (theme enhancement) | |
Engines Accepted | Steam Diesel Electric Maglev | |
Shop | Lucy's Shop | |
Other Information | • The Story • Contractor Station Street Sizes • Maximum Passengers Per Hour • General Contractor Information |
Contract list
# | Contract | Reward | XP |
---|---|---|---|
1 | Build 10 Phone Box decorations (Code Correction: glas'Code Correction: stee'Free) |
3 Phone Box (, decoration) |
1,200 |
2 | Deliver 750,000 | NMT Tail (, +250%) | 2,400 |
3 | Deliver 50,000 AND Deliver 50,000 |
2x NMT Generator Car (, +220%) |
3,600 |
4 | Send 55 GWR Railcar locos OR Deliver 1,550,000 |
2x NMT Recording Car (, +230%) |
4,800 |
5 | Send 12 NMT Generator Car AND Send 12 NMT Recording Car |
3x NMT System Car (, +240%) |
6,000 |
6 | Deliver 1,000,000 AND Deliver 60,000 AND Deliver 50,000 |
NMT Class 43 (, 8 ) |
7,200 |
7 | Deliver 60,000 AND Deliver 60,000 AND Deliver 50,000 |
30 | 8,400 |
8 | Build 10 Bench Ad decorations (Code Correction: stee100,000 ; 8,500 ) |
3 Bench Ad (, decoration) |
9,600 |
9 | Send 65 Deltic 55 locomotives OR Deliver 95,000 |
BR Class 89 Double (, 20 ) |
10,800 |
10 | Send 15 PF Nail 120 | 2x Nail Container (, , +90% ) |
12,000 |
11 | Deliver 1,200,000 AND Deliver 50,000 AND Deliver 50,000 |
Greenwich (, 92 , 20 ) |
13,200 |
12 | Build 4 Roadmaster (Code Correction: rubb100,000 ; 6,800 ) AND Build 6 London Cab (Code Correction: steeCode Correction: rubb72,000 ) |
Nelson Column (, decoration) |
14,400 |
13 | Deliver 60,000 AND Deliver 60,000 AND Deliver 60,000 |
3x Mark 3P (, 205 , +40%) |
15,600 |
14 | Deliver 1,600,000 | 4x Mark 3M (1,650 , +30%) |
16,800 |
15 | Send 24 NMT System Car OR Deliver 2,500,000 |
4x Mark 3P (, 205 , +40%) |
18,000 |
16 | Send 8 NMT Tail OR Deliver 2,500,000 |
Class 43 Tail (, +250%) |
19,200 |
17 | Send 10 TGV Sud-Est locomotives | BR Class 43 HST (, 12 ) |
20,400 |
18 | Send 10 BR Class 43 HST OR Deliver 220,000 |
30 | 21,600 |
19 | Build The Fragment (Code Correction: glas'Code Correction: rubbCode Correction: tita'Free) |
Bank of the Land (, 182 /h, 35) |
22,800 |
20 | Deliver 2,550,000 | Twin Towers (, 196 , 37) |
24,000 |
21 | Deliver 85,000 AND Deliver 85,000 |
2x Norfolk Bricks (, , +75%) |
25,200 |
22 | Deliver 85,000 AND Deliver 85,000 |
2x Stourbridge Glass (, , +75%) |
26,400 |
23 | Deliver 85,000 AND Deliver 85,000 |
2x Melbury Marble (, , +75%) |
27,600 |
24 | Deliver 6,000,000 OR Deliver 170,000 |
3x Norfolk Bricks (, , +75%) |
28,800 |
25 | Deliver 6,000,000 OR Deliver 170,000 |
3x Stourbridge Glass (, , +75%) |
30,000 |
26 | Deliver 6,000,000 OR Deliver 170,000 |
3x Melbury Marble (, , +75%) |
31,200 |
27 | Send 30 BR Class 52 (blue) AND Send 30 BR Class 52 (red) |
BR Class 41 Double (, 15 ) |
32,400 |
28 | Deliver 100,000 AND Deliver 100,000 AND Deliver 50,000 |
40 | 33,600 |
29 | Build New Wembley (Code Correction: carbCode Correction: wire3,500,000 ) |
New Wembley (, 222 /hr, 37) |
34,800 |
30 | Deliver 135,000 AND Deliver 135,000 |
35 | 36,000 |
31 | Deliver 165,000 AND Deliver 165,000 |
BR Class 86 Double (, 14 ) |
37,200 |
32 | Send 14 Warship Freight I Trainset | Olympic Stadium (, 292 /h, 40) |
38,400 |
33 | Build 10 Empty Tow Truck decoration (Code Correction: rubbCode Correction: wire16,000 ) |
Impounded Superveloce (, decoration) |
39,600 |
34 | Sell 8 Empty Tow Truck decoration | Cyan Superveloce (, decoration) |
40,800 |
35 | Build 6 Semi-Detached House (Code Correction: bricCode Correction: grav'Free) AND Build 2 Condo Tower (Code Correction: steeCode Correction: cemeCode Correction: plas'Free) |
1x Condo Tower (, 151 /h, 20 ) |
42,000 |
36 | Deliver 220,000 AND Deliver 180,000 |
40 | 43,200 |
37 | Build Charing Cross (Code Correction: marbCode Correction: sili350,000 ) |
BR Class 373 Tail (, +480%) |
44,400 |
38 | Deliver 20,000,000 OR Deliver 500,000 |
4x Calais (, 210 +15%) |
45,600 |
39 | Deliver 275,000 AND Deliver 275,000 |
4x Ashford (, 215 , +60%) |
46,800 |
40 | Deliver 23,000,000 OR Deliver 550,000 |
4x Calais (, 210 +15%) |
48,000 |
41 | Deliver 200,000 AND Deliver 200,000 AND Deliver 200,000 |
4x Ashford (, 215 , +60%) |
49,200 |
42 | Send 30 PBKA locomotives OR Deliver 27,500,000 |
BR Class 373 (, 17 ) |
50,400 |
43 | Build 6 Police Box decorations (Code Correction: wire600,000 ; 30,000 ) |
Police Box (, decoration) |
51,600 |
44 | Deliver 300,000 AND Deliver 300,000 |
2x Bradford Steel (, , +75%) |
52,800 |
45 | Deliver 300,000 AND Deliver 300,000 |
2x Blackpool Fuel (, , +75%) |
54,000 |
46 | Deliver 300,000 AND Deliver 300,000 |
2x Bristol Wires (, , +75%) |
55,200 |
47 | Send 35 PF Steel 120 wagons | 3x Bradford Steel (, , +75%) |
56,400 |
48 | Send 35 PF Fuel 120 wagons | 3x Blackpool Fuel (, , +75%) |
57,600 |
49 | Send 250 Wire Transport wagons AND Send 250 FULL Wire Carrier wagons |
3x Bristol Wires (, , +75%) |
58,800 |
50 | Send 125 Class 70 PowerHaul locomotives | BR Class 31 Double (, 15 ) |
60,000 |
51 | Deliver 200,000 AND Deliver 200,000 AND Deliver 200,000 |
45 | 61,200 |
52 | Deliver 22,000,000 AND Deliver 175,000 |
Swimming Arena (, 270 /h, 37) |
62,400 |
53 | Deliver 350,000 OR Deliver 350,000 |
Olympic Tennis (, decoration) |
63,600 |
54 | Deliver 350,000 OR Deliver 350,000 |
Olympic Swimming (, decoration) |
64,800 |
55 | Deliver 350,000 OR Deliver 350,000 |
Olympic Athletics (, decoration) |
66,000 |
56 | Deliver 30,000,000 OR Deliver 350,000 |
Olympic Cycling (, decoration) |
67,200 |
57 | Deliver 350,000 OR Deliver 350,000 |
Olympic Volleyball (, decoration) |
68,400 |
58 | Build 10 Fireworks (Code Correction: plas7,850,000 ; 550,000 ) |
65x | 69,600 |
59 | Send 185 BR Class 60 FP | BR Class 47 Double (, 18 ) |
70,800 |
60 | Build Olympic Banners (Code Correction: steeCode Correction: wire1,500,000 ) |
Olympic Banners (, decoration) |
72,000 |
61 | Deliver 28,000,000 | 50 | 73,200 |
62 | Deliver 200,000 AND Deliver 200,000 |
2x Derby Gravel (, , +75%) |
74,400 |
63 | Deliver 25,000,000 AND Deliver 200,000 |
3x Derby Gravel (, , +75%) |
75,600 |
64 | Send 22 BR Class 31 Double OR Deliver 350,000 |
BR Class 31 Triple (, 20 ) |
76,800 |
65 | Deliver 225,000 AND Deliver 225,000 AND Deliver 225,000 |
100 | 78,000 |
66 | Deliver 250,000 AND Deliver 250,000 |
2x Southampton Rubber (, , +75%) |
79,200 |
67 | Deliver 250,000 AND Deliver 250,000 |
3x Southampton Rubber (, , +75%) |
80,400 |
68 | Send 25 BR Class 41 Double OR Deliver 30,000,000 |
BR Class 41 Triple (, 20 ) |
81,600 |
69 | Build Royal Albert Hall (Code Correction: uranCode Correction: marb250,000 ) |
Royal Albert Hall (, 212 /h, 29) |
82,800 |
70 | Deliver 45 Maglev Locomotives | 50 | 84,000 |
71 | Build 3 Hot Air Balloon decorations (Code Correction: carb'Code Correction: wireCode Correction: plas'Free) |
Hot Air Balloon (, decoration) |
85,200 |
72 | Deliver 200,000 AND Deliver 200,000 AND Deliver 150,000 |
BR 395 Hera Tail (, 225 , +60% ) |
86,400 |
73 | Deliver 27,000,000 AND Deliver 250,000 |
5x Ramsgate Hera (, 210 , +20% ) |
87,600 |
74 | Build Piccadilly AND Build 6 Terraced House (Code Correction: nailCode Correction: gravCode Correction: rubbCode Correction: wireCode Correction: sili7,000,000 ) |
5x Stratford Hera (, 220 , +25% ) |
88,800 |
75 | Send 115 Cobalt Mail OR Deliver 375,000 |
5x Ebbsfleet Hera (3,400 , +30% ) |
90,000 |
76 | Deliver 185,000 AND Deliver 185,000 AND Deliver 185,000 |
5x Margate Hera (, 220 , +55% ) |
91,200 |
77 | Deliver 32,500,000 OR Deliver 500,000 |
BR 395 Hera (, 21 ) |
92,400 |
78 | Deliver 220,000 AND Deliver 220,000 AND Deliver 140,000 |
55 | 93,600 |
79 | Send 20 Warship Freight II | Battersea A (, 141/h, 20) |
94,800 |
80 | Send 20 Anglia Freight II | Battersea B (, 141/h, 20) |
96,000 |
81 | Send 400 Wood Shipper AND Send 400 Wire Shipper |
5x Telegraph Pole Wagon (, +60%, +60%) |
97,200 |
82 | Build Chocolate Factory (Code Correction: bric'Code Correction: glasCode Correction: ceme'Free) |
Chocolate Factory (, 240 /h, 30) |
98,400 |
83 | Send 150 Milk Tank Wagon | 8x MPU Boat Carrier (, +325%) |
99,600 |
84 | Deliver 25,000,000 AND Deliver 250,000 AND Deliver 250,000 |
10x One Pound Fish (, +300%) |
100,800 |
85 | Build The Tube (Code Correction: uran'Code Correction: cemeCode Correction: rubb'Free) |
The Tube (, decoration) | 102,000 |
86 | Deliver 285,000 AND Deliver 285,000 |
Trafalgar Ship (, decoration) |
103,200 |
87 | Build Hyde Park Statue AND Build 10 Hornbeam Tree AND Build 10 Park Trees (Code Correction: marb600,000 ; 125,000 ) |
Hyde Park Statue (, decoration) |
104,400 |
88 | Deliver 235,000 AND Deliver 235,000 AND Deliver 200,000 |
Railroad Tavern (, 150 /h, 17) |
105,600 |
89 | Deliver 30,000,000 AND Deliver 300,000 |
60 | 106,800 |
90 | Send 133 Steam locomotives AND Send 133 Diesel locomotives AND Send 133 Electric locomotives |
Rain (theme enhancement) |
108,000 |
Train sets rewarded
Lucy gives the following train sets as rewards for completing her contracts. After the name of each set is a number in parentheses; this is the contract number that awards the final piece of the set.
Gold
- InterCity 125 (17)
- Eurostar (42)
- Javelin Hera (77)
Material
- Warship Freight I (27)
- Anglia Freight I (50)
- Anglia Freight II (64)
- Warship Freight II (68)
XP
- New Measurement Train (6)
Description | Photo |
---|---|
Splash screen from collection of Lucy's final contract. | |
Certificate from Lucy granting you the use of her station and explaining the final bonus associated with completion of her contracts. |