TrainStation Wiki
Register
Advertisement
TrainStation Wiki
SCALED CONTRACTOR: This Contractor has multiple versions of the contracts/rewards for different player levels. These contracts can be completed once per level group. Once you have started with the contracts, you will stay in the same level group, regardless if you reach a higher level. The details for each group are available at these pages:
Level Groups: 120-299 300-699 700+
{{{hist}}}{{{scahist}}}
Contractor Profile Edison (Overview)
Once again, Electric Extravaganza begins!
Event Electric Extravaganza
Portrait full Edison (2020)
Available 24 Feb 2020 - 23 Mar 2020
Total Contracts 21
Minimum Level 120-299
Travel Time 3 hours
Final Reward 50 Resource Gems
Accepted Locomotives Icon Steam  Icon Diesel  Icon Electric  Icon Maglev
Shop Edison's Shop (2020)
Other Information The Story
Contractor History

Contract list[]

# Objective Reward Train Ride XP
1 Deliver 26,500 Resource Bricks 10 Resource Gems 9,400
2 Build 1 Menlo Laboratory I Icon Building
• Cost: 28,000 Resource Wood; 26,500 Resource Bricks
1 Menlo Laboratory I
(Icon Building, +650 Resource Income/h, 13 Misc Space)
Menlo Laboratory
10,200
3 Deliver 29,500 Resource Wires 9 Edison Economy
(Icon Passenger Wagon, 1,400 Resource Passenger, +1,250%)
Edison Economy (2020)
11,000
4 Deliver 31,000 Resource Marble 1 Direct Flag
(Icon Flag, +200% Resource Passenger, +200% Resource Income, 7d 0h Misc Duration)
Direct Flag
11,800
5 Build 1 Lamp Factory A I Icon Building
• Cost: 32,500 Resource U-235; 29,500 Resource Wires
1 Lamp Factory A I
(Icon Building, +624 Resource Income/h, 12 Misc Space)
Lamp Factory A
12,700
6 Build 1 Lamp Factory B I Icon Building
• Cost: 34,000 Resource Steel; 31,000 Resource Marble
1 Lamp Factory B I
(Icon Building, +1,188 Resource Income/h, 22 Misc Space)
Lamp Factory B
13,500
7 Deliver 35,500 Resource Rubber 9 Edison 2nd class
(Icon Passenger Wagon, 1,450 Resource Passenger, +1,300%)
Edison 2nd class (2020)
14,300
8 Build 1 SS Colombia I Icon Decoration
• Cost: 35,500 Resource Rubber; 37,000 Resource Titanium
1 SS Colombia
(Icon Decoration)
SS Colombia
15,100
9 Deliver 38,500 Resource Plastics 2 Direct Flag
(Icon Flag, +200% Resource Passenger, +200% Resource Income, 7d 0h Misc Duration)
Direct Flag
15,900
10 Deliver 40,000 Resource Nails 9 Edison Restaurant
(Icon Passenger Wagon, 1,500 Resource Passenger, +1,350%)
Edison Restaurant
16,700
11 Build 1 Glenmont I Icon Building
• Cost: 41,500 Resource Wood; 40,000 Resource Nails; 38,500 Resource Plastics
1 Glenmont I
(Icon Building, +1,344 Resource Income/h, 24 Misc Space)
Glenmont
17,600
12 Send 10 ANY Icon Steam   2 Alternating Flag
(Icon Flag, +250% Resource Passenger, +250% Resource Income, 7d 0h Misc Duration)
Alternating Flag
18,400
13 Deliver 5,000,000 Resource Gold 9 Edison 1st class
(Icon Passenger Wagon, 1,550 Resource Passenger, +1,400%)
Edison 1st class (2020)
19,200
14 Deliver 43,000 Resource Glass 20 Resource Gems 20,000
15 Build 1 Copper Cube I Icon Decoration
• Cost: 5,000,000 Resource Gold; 44,500 Resource Bricks; 43,000 Resource Glass
1 Copper Cube
(Icon Decoration)
Copper Cube
20,800
16 Send 80 Bulky Silicon Icon Cargo   9 Edison VIP
(Icon Passenger Wagon, 1,600 Resource Passenger, +1,450%)
Edison VIP (2020)
21,600
17 Deliver 46,000 Resource Carbon 3 Alternating Flag
(Icon Flag, +250% Resource Passenger, +250% Resource Income, 7d 0h Misc Duration)
Alternating Flag
22,400
18 Deliver 47,500 Resource U-235 1 Edison Tail
(Icon Passenger Wagon, 1,650 Resource Passenger, +1,500%)
Edison Tail
23,300
19 Build 1 Seminole Lodge I Icon Building
• Cost: 47,500 Resource U-235; 46,000 Resource Carbon; 49,000 Resource Marble
1 Seminole Lodge I
(Icon Building, +1,044 Resource Income/h, 18 Misc Space)
Seminole Lodge
24,100
20 Send 10 ANY Icon Electric   1 PRR GG1 Edison I
(Icon Electric, 46 Icon Power)
PRR GG1 Edison
24,900
21 Send 3 Edison Express I Logo Set [1] (Icon Storage Reward 50 Resource Gems 25,700
  1. See the Train Sets page for more information on constructing sets.

Train Sets Rewarded[]

Edison gives the following train sets as a reward for completing his contracts.
The number before the name of the set is the contract number that awards the final piece of the set.

Advertisement