TrainStation Wiki
Register
Advertisement
TrainStation Wiki
SCALED CONTRACTOR: When this Contractor was first released, only the contracts/rewards now found under Levels 100 were available. Upon their return in 2019, PF introduced multiple versions of the contracts/rewards for different player levels. These contracts can be completed once per level group. Once you have started with the contracts, you will stay in the same level group, regardless if you reach a higher level. The details for each group are available at these pages:
Level Groups: 100-299 300-499 500-699 700+
{{{hist}}}{{{scahist}}}
Contractor Profile Dave (Overview)
Summer is almost here! Honor the sun with Dave.
Event Music
Portrait full Dave (2015)
Available 24 Jun 2019 - 22 Jul 2019
Total Contracts 21
Minimum Level 300-499
Travel Time 4 hours
Final Reward 60 Resource Gems
Accepted Locomotives Icon Steam  Icon Diesel  Icon Electric  Icon Maglev
Shop Dave's Shop (2015)
Other Information The Story
Contractor History

Contract list[]

# Objective Reward Train Ride XP
1 Deliver 2,500,000 Resource Gold 5 Hard Rock Flag
(Icon Flag, +205% Resource Passenger, +205% Resource Income, 7d 0h Misc Duration)
Hard Rock Flag
305,900
2 Send 6 PESA ELF Logo Set [1]   10 Resource Gems 332,500
3 Send 50 Görlitz 2nd Class Icon Passenger Wagon   12 Phonic Wires
(Icon Cargo, Resource Wires, +420%)
Phonic Wires
359,100
4 Build 1 Practice Studio Icon Building
• Cost: 3,750,000 Resource Gold; 150,000 Resource Titanium
1 Ecolisk
(Icon Building, +386 Resource Income/h, 7 Misc Space)
Ecolisk
385,700
5 Deliver 240,000 Resource Steel
AND
Deliver 240,000 Resource Rubber
AND
Deliver 90,000 Resource Wood
12 Phonic Titanium
(Icon Cargo, Resource Titanium, +420%)
Phonic Titanium
412,300
6 Send 400 Bulky Wires Icon Cargo   12 Phonic Steel
(Icon Cargo, Resource Steel, +420%)
Phonic Steel
438,900
7 Build 1 Concert Stage Icon Building
• Cost: 240,000 Resource Steel; 240,000 Resource Rubber; 150,000 Resource Wires
AND
Build 10 Porta-Potty Icon Decoration
• Cost: 40,000 Resource Plastics
10 Resource Gems 465,500
[2] Send 2 Recipient Liner Logo Set [1]   12 Phonic Silicon
(Icon Cargo, Resource Silicon, +420%)
Phonic Silicon
492,100
9 Send 36 Phonic Titanium Icon Cargo (Icon Storage Reward
AND
Send 36 Phonic Wires Icon Cargo (Icon Storage Reward
10 Resource Gems 518,700
10 Build 10 Rock Poster Icon Decoration
• Cost: 2,000,000 Resource Gold
2 Rock Poster
(Icon Decoration)
Rock Poster
545,300
11 Deliver 450,000 Resource Carbon
AND
Deliver 450,000 Resource Plastics
10 Resource Gems 571,900
12 Send 40 ANY Icon Electric   1 VR Phonic Tech
(Icon Electric, 48 Icon Power)
VR Phonic Tech
598,500
13 Build 3 Show Stage Icon Building
• Cost: 120,000 Resource Steel; 450,000 Resource Carbon; 450,000 Resource Plastics
AND
Build 3 Music Tent Icon Decoration
• Cost: 90,000 Resource Wood
3 Music Tent
(Icon Decoration)
Music Tent
625,100
14 [2] Send 4 VR Phonic Cargo Logo Set [1] (Icon Storage Reward 10 Resource Gems 651,700
15 Deliver 300,000 Resource Wires 5 Hard Rock Flag
(Icon Flag, +205% Resource Passenger, +205% Resource Income, 7d 0h Misc Duration)
Hard Rock Flag
678,300
16 Send 400 Boston Icon Mail Wagon   20 R2R 2nd class
(Icon Passenger Wagon, 4,000 Resource Passenger, +420%)
R2R 2nd class
704,900
17 Deliver 5,000,000 Resource Gold 10 R2R 1st class
(Icon Passenger Wagon, 3,000 Resource Passenger, +650%)
R2R 1st class
731,500
18 Send 100 R2R 2nd class Icon Passenger Wagon (Icon Storage Reward
AND
Send 50 R2R 1st class Icon Passenger Wagon (Icon Storage Reward
10 R2R VIP
(Icon Passenger Wagon, 4,000 Resource Passenger, +650%)
R2R VIP
758,100
19 Deliver 360,000 Resource Fuel 1 R2R Bandtrain
(Icon Electric, 40 Icon Power)
R2R Bandtrain
784,700
20 Build 1 Rockside Stage Icon Building
• Cost: 360,000 Resource Fuel; 360,000 Resource Titanium; 300,000 Resource Wires
1 Omnitower
(Icon Building, +572 Resource Income/h, 11 Misc Space)
Omnitower
811,300
21 Send 1 R2R Express Logo Set [1] (Icon Storage Reward 60 Resource Gems 837,900
  1. 1.0 1.1 1.2 1.3 See the Train Sets page for more information on constructing sets.
  2. 2.0 2.1 After completing this contract Dave will move to another station and you will lose all buildings and decorations erected by you. Sell them before completing this contract to get some Resource Gold which you might be able to use for a later contract.

Train Sets Rewarded[]

Dave gives the following train sets as a reward for completing his contracts.
The number before the name of the set is the contract number that awards the final piece of the set.

Advertisement