TrainStation Wiki
Advertisement
TrainStation Wiki
SCALED CONTRACTOR: This Contractor has multiple versions of the contracts/rewards for different player levels. These contracts can be completed once per level group. Once you have started with the contracts, you will stay in the same level group, regardless if you reach a higher level. The details for each group are available at these pages:
Level Groups: 120-299 300-699 700-1199 1200+
{{{hist}}}{{{scahist}}}
Contractor Profile Cyber Alex (Overview)
Help Alex start his own business on Mars!
Event Maglev Madness
Portrait full Cyber Alex (2020)
Available 17 Aug 2020 - 14 Sep 2020
Total Contracts 21
Minimum Level 1200+
Travel Time 4 hours
Final Reward 75 Resource Gems
Accepted Locomotives Icon Steam  Icon Diesel  Icon Electric  Icon Maglev  Icon Hyperloop
Shop Cyber Alex's Shop (2020)
Other Information The Story
Contractor History

Contract list[]

# Objective Reward Train Ride XP
1 Deliver 6,266,000 Resource Bricks 1 Scopulus Tail
(Icon Passenger Wagon, 2,900 Resource Passenger, +5,000%)
Scopulus Tail
12,866,000
2 Deliver 6,507,000 Resource Wood 14 Scopulus 2nd class
(Icon Passenger Wagon, 2,650 Resource Passenger, +4,000%)
Scopulus 2nd class
13,985,000
3 Build 1 Scopulus HQ Icon Building
• Cost: 6,507,000 Resource Wood; 6,748,000 Resource Nails; 6,266,000 Resource Bricks
1 Scopulus HQ
(Icon Building, +2,660 Resource Income/h, 19 Misc Space)
Scopulus HQ
15,104,000
4 Send 1000 Old Maglev Car Icon Passenger Wagon   14 Scopulus 1st class
(Icon Passenger Wagon, 2,500 Resource Passenger, +9,000%)
Scopulus 1st class
16,223,000
5 Deliver 2,500,000,000 Resource Gold 20 Resource Gems 17,342,000
6 Build 5 Scopulus Banner Icon Decoration
• Cost: 2,500,000,000 Resource Gold; 7,000,000 Resource Steel
5 Scopulus Banner
(Icon Decoration)
Scopulus Banner
18,461,000
7 Deliver 7,230,000 Resource Marble 14 Scopulus VIP
(Icon Passenger Wagon, 2,650 Resource Passenger, +12,000%)
Scopulus VIP
19,580,000
8 Deliver 7,471,000 Resource Cement 1 Scopulus IV
(Icon Maglev, 43 Icon Power)
Scopulus
20,699,000
9 Build 1 Scopulus Station Icon Building
• Cost: 7,712,000 Resource Glass; 7,471,000 Resource Cement; 7,230,000 Resource Marble
1 Scopulus Station
(Icon Building, +3,300 Resource Income/h, 22 Misc Space)
Scopulus Station
21,818,000
10 Send 3 Scopulus Maglev Logo Set [1] (Icon Storage Reward 25 Resource Gems 22,937,000
11 Deliver 350,000 Resource Borax 1 Nimbus Tail
(Icon Cargo, Resource Silicon, +4,000%)
Nimbus Tail (Cyber Alex)
24,056,000
12 Build 5 Maglev Monument Icon Decoration
• Cost: 350,000 Resource Borax; 350,000 Resource Wolfram
5 Maglev Monument
(Icon Decoration)
Maglev Monument (Cyber Alex)
25,175,000
13 Send 100 ANY Icon Electric   10 Nimbus Wood
(Icon Cargo, Resource Wood, +3,700%)
Nimbus Wood
26,294,000
14 Deliver 500,000 Resource Aerogel 4 Scopulus Flag
(Icon Flag, +300% Resource Passenger, +300% Resource Income, 7d 0h Misc Duration)
Scopulus Flag
27,413,000
15 Deliver 500,000 Resource Lithium 10 Nimbus Glass
(Icon Cargo, Resource Glass, +3,700%)
Nimbus Glass
28,532,000
16 Build 1 Fusion Reactor Icon Decoration
• Cost: 500,000 Resource Lithium; 500,000 Resource Aerogel; 500,000 Resource Nanotubes
1 Fusion Reactor
(Icon Decoration)
Fusion Reactor
29,651,000
17 Send 100 ANY Icon Maglev   10 Nimbus Fuel
(Icon Cargo, Resource Fuel, +3,700%)
Nimbus Fuel
30,770,000
18 Deliver 350,000 Resource Xenon 10 Nimbus Silicon
(Icon Cargo, Resource Silicon, +3,700%)
Nimbus Silicon
31,889,000
19 Deliver 350,000 Resource Bismuth 1 Nimbus IV
(Icon Maglev, 41 Icon Power)
Nimbus Leopard
33,008,000
20 Build 1 Fusion Power Plant Icon Building
• Cost: 500,000 Resource Neodymium; 350,000 Resource Bismuth; 350,000 Resource Xenon
1 Fusion Power Plant
(Icon Building, +4,800 Resource Income/h, 30 Misc Space)
Fusion Power Plant
34,127,000
21 Send 3 Nimbus Cargo Logo Set [1] (Icon Storage Reward 75 Resource Gems 35,246,000
  1. 1.0 1.1 See the Train Sets page for more information on constructing sets.

Train Sets Rewarded[]

Cyber Alex gives the following train sets as a reward for completing his contracts.
The number before the name of the set is the contract number that awards the final piece of the set.

Advertisement